Inspection failed — all 6 items resolved in 2 days

Safety inspection raised 6 non-conformances. Reinspection booked in 3 days. Items scattered across trades.

Without platform

Email threads to each subcontractor. No clear ownership. Risk of missing the reinspection deadline.

With Bau4You

Punch list created in Bau4You, each item assigned with deadline and photo requirement. All 6 resolved before reinspection.

2 days

to close all 6 non-conformances

The result when the right tools are in place before the problem hits — not after.

The full story

A site manager on a commercial fit-out received 6 non-conformances after a safety inspection. With reinspection in 3 days and items spread across trades, they created a punch list in Bau4You, assigned each item with a photo requirement and deadline. All 6 were resolved and evidenced 18 hours before reinspection. Passed first time.

How it works

01

Punch list in minutes

Log each non-conformance, assign to the responsible contractor, set a deadline.

02

Photo evidence required

Each item resolved with a timestamped photo. No ambiguity, no disputes.

03

Reinspection passed

Full audit trail ready for the inspector. All items closed before the deadline.