Hubert Robert · “The Demolition of the Houses on the Pont Notre-Dame in 1786”

A platform for general contractors, contractors and clients

All of constructionin one place

Tenders, estimates, the works log, site supervision and documents — in one workspace. Everyone on the team sees their step, and BauAI knows your project.

Free to startNo complex rolloutWorks in the browser

Workspace

Pulse · today

4 sites · 2 need attention · 3 documents await your signature

Work stopped by notice No. 7

Northern LCD

3 quantities await confirmation

Promcluster A

Period No. 4 is not closed — prepare the certificates

Horizon Tower

BauAI: progress certificate No. 4 is built from confirmed quantities — review it before signing.

Sound familiar?

Construction loses time not on the work itself but on everything around it: recounting, retyping, calls and searching.

The usual way

  • Quantities live in the site manager's notebook and in the engineering office's Excel
  • Certificates are retyped by hand before handover
  • Site status is found out by phone
  • Tenders are searched by hand across a dozen platforms

Bau4You.

  • One log: each quantity is linked to an estimate item right away
  • Progress certificates are built from confirmed quantities
  • Pulse shows what is urgent across all sites at once
  • Web Radar brings matching tenders to you

From tender to signed certificate.

What takes a construction team the most time — in one place and connected.

Find projects and partners

Web Radar scans thousands of sources and surfaces current tenders. Match finds projects and contractors by location, timing and resource readiness.

Tenders for youupdated 5 minutes ago

Turnkey logistics complex

Hamburg · €35–50M · bids until November 14

92%

Renovation of School No. 12

Amsterdam · €4.2M · bids until December 2

81%

Cast-in-place frame for a residential building

Vienna · 1.2 billion · bids until November 28

74%

Run the site from estimate to certificate

A site manager’s entry becomes a confirmed quantity, and the quantity becomes a line in the progress certificate. No Excel recounts or retyping, and everyone on the team sees their step.

  • The system records who confirmed and when
  • Overruns on an item are visible right away
  • A closed period locks quantities for certificates

Estimate

Approved 2 of 2

Site log

18 entries with estimate quantities

Verification

3 quantities await confirmation

Progress

Period No. 4 open · €160K

COP and signatures

No. 3 signed · No. 4 after the period closes

Documents built from data

Hidden works and progress certificates, notices and proposals are built from project data. Headers and footers on every page, signing by all parties, versions, Word and PDF.

  • Signing route and comments from the parties
  • Headers and footers, “Page N of M”, PDF and Word
  • A signature made before an edit is flagged
Progress cert. No. 3 for OctoberSignatures 2 of 3

Built from period No. 3 and estimate No. 1 · “Update from project data”

StroyMontazh GmbH · VAT DE812345678

Certificate of completed works

Position of the estimatesThis PeriodSum
Concrete B2596 m³€59,520
Rebar B500C11.2 t€103,040

Page 1 of 3

BauAI knows your project

Analyses specifications, writes documents from project memory, maps site manager entries to estimate items.

How much concrete is left in estimate No. 1?

Estimate No. 1 has 24 m³ of C25/30 concrete left out of 120. 96 m³ were confirmed in October, and 2 m³ more await site supervision.

Estimate No. 1 · FrameWorks log · October 16
Ask about the site…

Everyone sees their own.

One project, different roles. Pick yours and see how your day in Bau4You begins.

Site manager

You write what was done today in plain words — the quantity links itself to the estimate item.

PP

Your tasks for today

Site manager

Log today's work

Journal of Work

Log

Mark notice No. 9 as fixed

with an “after” photo

Mark

1 quantity rejected: actually 64 m²

Partition masonry

Fix

Bau4You modules.

Each module works on its own and together with the others — the project data is shared.

Get started in three steps.

No lengthy training or complex rollout.

  1. 1

    Create a project

    Name, address and project parties — a couple of minutes.

  2. 2

    Bring over your estimate

    From a document or by hand. The approved version becomes the basis for the log and certificates.

  3. 3

    Invite your team

    Assign roles — everyone immediately sees their step and their tasks.

Frequently asked questions.

You can start for free. Plans for teams and companies are on the page Pricing.

Try it on your own site.

No lengthy training or complex rollout: create a project, invite your team and run your first site today.